2 Merivale Venues Open Simultaneously 

Good Luck Restaurant

14 month duration from the initial site meeting, to the project completion..

5 individual rangehoods; 1 being a water mist system, which serves the open wood fired pit and smoker equipment. This system is an independent system that continues through the back of the building, exits into the light well and continues up 4 storeys to the roof level. It is then treated by a double pass electrostatic precipitator to create an environmentally friendly discharge, 1 in-line exhaust fan which includes, acoustic treatment to achieve the compliant noise level.

4 V-Filter bank rangehoods, which serve the woks, combi ovens, deep fryers, 8 burners, 6 burners and smoker equipment. All of these hoods combine into 1 exhaust system which also continues through the back of the building, exiting into the light well and continues up 4 storeys to the roof level. It is then treated by a single pass electrostatic precipitator to create an environmentally friendly discharge, 2 in-line exhaust fans side by side which includes, acoustic treatment to achieve the compliant noise level.

This project was extremely complex, due to the overall sizing of all the ventilation systems combined, within such limited space and limited site access. Very rewarding and successful outcome!

ONECUT10
ONECUT6

ONECUT11
ONECUT9

Jam Record Bar

6 month duration from the initial site meeting, to the project completion..

2 unique rangehoods, both being commercial grade and designed to meet the architect and designers requests. 1 hood serving the charcoal grill, the other serving the twin fryers and salamander. Both of these hoods combine into one exhaust system, which is then treated by a single pass electrostatic precipitator to create an environmentally discharge, 1 in-line fan and then through a single pass carbon filtration unit to remove the excess odour before exiting into the atmosphere.

2 water cooled air-conditioning units, which serve both front and back of house dining areas and the kitchen area. All of the supply air diffusers and return air grilles had to match this very unique fit-out and aesthetically please the architect and designers requests.

Very challenging, due to this project being such a unique fit-out and limited space for all of these systems to be installed. Another very rewarding and successful project!

ONECUT5
ONECUT4

ONECUT2
ONECUT_-6 (3) (1) (1)